Waimakariri_Footbridge_04

Waimakariri Foot Bridge

Crossing a small tributary to the mighty Waimakariri River, beside SH1, this arched footbridge used Weka SG8 products extensively in its construction.

Our Timber Consultants worked in closely with a Rangiora based Approved Reseller to provide a unique solution to meet the design and structural requirements.

Constructed by local contractors for the Waimakariri Council, it links two rest areas together on the side of the beautiful Waimakariri River in Canterbury.

A profiled handrail that was custom verified to Weka SG8 requirements, heavy section H5 timbers for abutments at each end, cut-to-length decking boards, handrail posts and balusters made up the supply of this project.