Temple View Legacy Park

ATS Timber worked in line with the main contractors for this project, Spartan Construction and Livingstone’s, and our local Approved Resellers to bring about this stunning result at Legacy Park.

This installation of custom designed boardwalks around the lake was superbly designed and immaculately completed. The trusted range of Weka SG8 Wet beams were designed throughout this boardwalk with all the major bearers and joists, finished off with a machine gauged decking.

Boardwalks were installed around the lakes edge, and through the remaining stand of native trees. Aged steel edging and signage was used throughout. A substantial play area set on the rise above the park is always humming with children during the day.

It is highly recommended on a visit to Hamilton to take the trip out to Tuhikaramea Rd and take some time to view and relax in this great park.

Eric Armishaw Reserve Walkway

Completion of Auckland’s $1.4 Billion Western Ring Route has been prioritised as a project of national significance. By connecting the south-western and north-western motorways the Waterview Connection creates a direct link between the Auckland CBD and the Airport. The project incorporates urban design initiatives that deliver new recreational facilities, upgraded parks and improved cycling and walking connections to the neighbouring communities of Avondale, Mt Albert and Point Chevalier.
The shared cycle and pedestrian boardwalk bridge featured here links to the path through the Waterview interchange and traverses the tidal zone heading north west into Eric Armishaw Reserve in Point Chevalier. This connection was built in mid-2016 .
ATS Timber supplied the timber required for this connection. This project involved preparation of custom profiled decking and handrails along with a range of SG8 verified structural timber solutions. All timber was treated H5 and supplied cut to length as per contractors requirements.